The 940

‘The 940’ plays a very important role in the history of the Southwest Ring Road. It is the centre of ring road planning from the very beginning, and in many ways remains the key to an alignment on Tsuu T’ina lands. But what is the 940?

The 940 is a 940 acre parcel of land that makes up the north-east corner of the Tsuu T’ina reserve. It is bordered by the City of Calgary on two sides, 37th street SW and Lakeview to the east, Glenmore Trail and Glamorgan to the north, and the Elbow river and Weaselhead defines its south and west borders. Every official alignment of a major road in this area has the road cutting directly though the heart of this land. Continue reading “The 940”

Advertisements

2009 Southwest Calgary Ring Road Design: Opening Day Stage

(For information about the 2013 ring road agreement including maps, click here)

In my previous article (found here) I wrote about the design of the Southwest Calgary Ring Road, and included the road diagrams. Those diagrams showed the ‘Ultimate Stage’ of the road, which showed the road as it would be once fully built out, something that would happen only once Calgary’s population reached the 2.1 million mark. However, they do not represent what would initially be built in the short term if this road becomes reality. This article covers the ‘Stage 1’ or ‘Opening Day’ design for the road that would be built if (or when) a deal is reached.

THE FUNCTIONAL PLANNING STUDY

Focus Engineering designed the road from about 2005 to about 2008, and did so with on behalf of the Province, with input from the City of Calgary, the Tsuu T’ina and stakeholder groups. The final road design is contained in the final Functional Planning Study (FPS) document.

‘OPENING DAY’ ROAD DIAGRAMS

The following diagrams are of the ‘Opening Day’ stage of the Southwest Calgary Ring Road, taken from the Functional Planning Study. The number in the circles on the road indicate lane count. Please click on the images to see a much larger version. (Note the direction of North, as the orientation changes from diagram to diagram).

101st Street SW and Highway 8 to 69th Street SW. Continue reading “2009 Southwest Calgary Ring Road Design: Opening Day Stage”